WCC has performed a number of projects for Kidron Mennonite Church over the past years.
The first projects was in 1988 with a renovation and expansion project to their fellowship hall.
In 2001 WCC removed the steeple/bell tower from the church and repaired the roof and reinstalled the steeple/bell tower.
In 2002 WCC remodeled the sanctuary which included increasing the size and redisigning the stage area, repainting, and renovating the south balcony area seating to improve the line of sight to the front of the sanctuary.
In 2003 WCC remodeled and expanded the west entry by 992 square feet. This included a larger vestibule and a covered portico.
In 2010 WCC renovated the lower educaton level of KMC's existing building. This included bringing the area up to code, changing some of the classroom configurations, changing interior finishes, changing lighting fixtures, and renovating the HVAC systems.
"All of the WCC Staff were very helpful during this process. Mike Eberly was always on top of each situation and kept the project moving and kept me informed about upcoming events....
Bob Witmer
Director, Orrville YMCA
Living Water Community Church Cafe, Dalton, Ohio
Living Water recently completed an addition of a café / community room to the church and we are very pleased with the outcome of both its purpose and the overall design and construction....
Mr. Mark Hirst
Senior Pastor
Archwood Industries, Wooster, Ohio
The purpose of this letter is to provide you with a complete and unlimited recommendation of Weaver Commercial Contractor (WCC). From our initial telephone inquiry to the day owe moved intor our...